Description
Haier COLUMN (FA) R32 Wi-Fi Inverter Air Conditioner | 7.2 kW, 24000 BTU
By purchasing this product you assume the obligation that the installation is carried out by a company certified pursuant to EU Regulation no. 517/2014
Haier COLUMN (FA) R32 Wi-Fi Inverter Monosplit Air Conditioner Kit
What's Included:
-
Outdoor Unit:
- Weight: 47 kg
- Dimensions: L: 89 cm, D: 35.3 cm, H: 69.7 cm
- Diet: Single phase
- Cooling Power: 7.2 kW
- Heating Power: 8 kW
- Refrigerant Gas: R32
- Noise Level: 56 dB(A)
- Matching Internal Units: 1
- Item Number: 1U71REAFRA
- Model: Haier COLUMN (FA) R32 Monosplit Outdoor Unit 7.2 kW 1U71REAFRA
- Technical Specifications:
-
Indoor Unit:
- Weight: 47 kg
- Dimensions: L: 50.5 cm, D: 33 cm, H: 181 cm
- Positioning: Column
- Diet: Single phase
- Ideal For: Up to 100 m²
- Attachement: 1/4 - 1/2
- Cooling Power: 7.2 kW
- Heating Power: 8 kW
- Power Absorbed Cold: 2.23 kW
- Power Absorbed Hot: 2.43 kW
- BTU Power: 24000
- Wi-Fi System: Yes
- Refrigerant Gas: R32
- Noise Level: 26 dB(A)
- Item Number: AP71UFAHRA
Zun Tower Air Conditioner Installation Manual
1. Preparation
- Read Manual: Ensure all steps and safety instructions are understood.
- Tools Needed: Driver, torque wrench, pipe cutter, hacksaw, reamer, flaring tool, spanner, gas leakage detector, etc.
2. Selecting Installation Site
- Indoor Unit: Easy drainage and piping, away from heat sources, well-ventilated.
- Outdoor Unit: Avoid enclosed spaces, near heat sources, ensure proper airflow, and sufficient space around the unit.
3. Installation of Indoor Unit
- Fix Wall Panel: Secure the panel on the wall, ensuring it is horizontal.
- Piping Layout: Connect indoor piping with thermal insulation, ensure no leaks.
- Pressure Test: Use nitrogen to check for leaks; maintain pressure for 5 minutes.
4. Installation of Outdoor Unit
- Mounting: Secure the unit on a stable base.
- Piping Connection: Connect pipes without excessive force to avoid damage.
5. Electrical Connections
- Wiring: Ensure correct wiring according to local standards, and reliable grounding.
- Safety: Use a leakage protector and ensure all connections are secure.
6. Final Steps
- Vacuumizing: Use a vacuum pump for at least 15 minutes, ensuring no leaks.
- Leak Detection: Check all joints and connections.
- Test Run: Verify all functions using the remote control, ensure proper cooling/heating.
7. Maintenance and Troubleshooting
- Regular Checks: Clean filters every two weeks, inspect for refrigerant leaks.
- Troubleshooting: Follow manual guidelines for any operational issues.
This overview provides a structured guide to install the Zun Tower air conditioner, ensuring safety and efficiency throughout the process. For detailed diagrams and additional instructions, please refer to the manual provided by the manufacturer.